| Recent Magnetic Field Projects 4
Times Square, Conde Nast Building, Cosentini-Magnetic field calculations, EMF
shield design and measurements.
Also EMF interference assessment for NASDAQ-Amex MarketSite studio
installation at the Conde Nast building (Barney Skanska). United
Nations, Secretariat Building-EMF measurements and assessment for 12th,
13th, 14th, 27th, 29th, 32nd,
and 34th floors. Chicago
Board of Trade-EMF consulting for the new CBOT building in Chicago. Hanover
Square, Goldman Sachs-EMF measurements and shield design for the new health club
installation beneath Con Edison transformer vaults and the main building
switchgear. Also,
EMI consulting on interference with communications equipment in electric
closets. Waterhouse
Securities-EMF consulting for new Park Avenue trading facility.
Interference caused by magnetic fields from the subway power system. Memorial
Sloan-Kettering and Rockefeller Institute-EMF and RF measurements for siting of
new MRI installation and a gamma knife facility. HeartScan,
Washington DC-Shield design and installation to correct interference problem
with a CT scanner. 3
Times Square, Reuters Building, Rudin Management-Magnetic field calculations and
shield design. Texas
Instruments, Semiconductor Facility, Dallas Texas-EMF measurements and
mitigation via ground system enhancement. New
Suffolk County Trial Courthouse, Boston, MA, Kallman McKinnel &Wood
Architects-EMF measurements and shield design. Memorial
Medical, New Orleans-EMF measurements and shield design for CT scanner
installation. Bank
One, Austin, Texas-EMF consulting to eliminate computer display interference
caused by utility equipment. 32
Islip, Goldman Sachs-EMF consulting on shielding of Cat 5 cables in electric
closets. Environmental
compliance for Blue Herron 230kV transmission line, Florida. Fort Ritchie, MD-Consulting on metal detector interference for Army Corp. of Engineers.